Loading manual…
Loading manual…
Version: 01 Date: 2021/11/30 Service Manual - U2723QE/U3023E/U3223QE
Product Announcement: This product is certificated to meet RoHS Directive and Lead-Free produced definition. Using approved critical components only is…
2. Exploded view diagram with list of items 1 2 3 4 5 6 7 8 Item Description Q'ty Remark 1 ASSY Middle Frame 1 For EMEA Only, not for other regions 2 ASSY Rear…
4. How to connect and disconnect power cable/ connectivity cable WARNING: To change power cable/ connectivity cable, switch off power before unplugging the…
5. Disassembly and Assembly Procedures 4.1 Disassembly Procedures(U3223QE for example): Tool Required: List the type and size of the tools that would typically…
5. Disassembly and Assembly Procedures S10 S9 S11 S8 Tear off the tape on the middle bezel for releasing the LED cable, and then tear off the mylar tape to…
5. Disassembly and Assembly Procedures Use a Philips-head screwdriver to remove screws for interface board and power board. 8pcs (No.1 screw size=M4x8…
5. Disassembly and Assembly Procedures Take a power board and put the power board into the bracket chassis, settle the cable to the correct position. Place a…
5. Disassembly and Assembly Procedures S8 Adjust the bracket chassis module, and then u . se a Philips-head screwdriver to tighten 4pcs screws for locking the…
5. Disassembly and Assembly Procedures S13 Take 1pcs USB board, 2pcs cables and 1pcs conductive foam. Connect the 2pcs cables to the connectors of the Usb…
5. Disassembly and Assembly Procedures Take a stand base close to the monitor. Fit the two tabs on the upper part of the stand into the grooves, and then lower…