Read these instructions carefully and look at the equipment to become familiar with it before trying to install, operate, service or maintain it. The following…
Accessory Kit 0M-95318: Busbar Kit NOTE: Save this accessory kit for the field service representative. The busbars will be installed by Schneider Electric…
1. Prepare for Installation, page 19. 2. Install the Rear Seismic Anchoring, page 21. 3. Position and Interconnect the Battery Cabinets, page 23. 4. Install…
Shut Down the Battery Solution NOTE: This procedure is only for a short temporary shutdown of the battery solution. If the battery solution should remain shut…
Status LEDs LED Battery Status Description Normal The battery breaker is in the OFF (open) position. Normal The battery breaker is in the ON (closed) position.…
1. Lockout/Tagout the battery breaker in the OFF (open) position and open the two fuse holders in the battery cabinet. 2. Lockout/Tagout the power to the SMPS…