UPS for External Batteries Important Safety Instructions — SAVE THESE INSTRUCTIONS Read these instructions carefully and look at the equipment to become…
UPS for External Batteries Specifications Specifications for 400 V Systems Input Specifications 400 V 20 kW 30 kW 40 kW 50 kW 60 kW 80 kW 100 kW Voltage (V)…
UPS for External Batteries Single System Overview UIB Unit input breaker SSIB Static switch input breaker IMB Internal maintenance breaker UOB Unit output…
UIB Unit input breaker SSIB Static switch input breaker IMB Internal maintenance breaker UOB Unit output breaker SIB System isolation breaker BB Battery…
UPS for External Batteries Overview of Installation Kits Installation Kit 0M-100883 Part Used in Number of units Spring washer Connect the Power Cables, page…
1. Prepare for Installation, page 40. 2. Install the Seismic Anchoring (Option), page 44. 3. Only for TN-C/3-wire earthing system or TN-C-S/4-wire earthing…
UPS for External Batteries Installation Procedure for Parallel Systems Simplified 1+1 Parallel System Parallel System 1. Prepare for Installation, page 40. 2.…
DANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Do not drill or punch holes for cables or conduits with the gland plate installed and do not drill or…
1. Mount the rear anchor(s) to the floor. Use appropriate hardware for the floor type – the hole diameter in the rear anchor is ø14 mm. 2. Install the rear…
UPS for External Batteries Prepare the UPS for Earthing System NOTE: The UPS is preconfigured for TNS earthing system. NOTE: 3–wire installation using a…
DANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH In single mains systems where power cables are split due to the cable size restriction, use the bypass…
NOTE: Route the signal cables separately from the power cables and route the Class 2/SELV cables separately from the non-Class 2/non-SELV cables. 1. Connect…
UPS for External Batteries Connect the IMB Signal Cables in a Simplified 1+1 Parallel System NOTE: Route the signal cables separately from the power cables to…
UPS for External Batteries Connect the PBUS Cables 1. Connect the provided PBUS 1 (white) and PBUS 2 (red) cables to the PBUS ports in the UPS controller…
1. Connect the external communication cables to the ports in the UPS controller box. Front View of the Controller Box A. Universal I/O port for built-in…
UPS for External Batteries Add Translated Safety Labels to Your Product The safety labels on your product are in English and French. Sheets with translated…
1. Reinstall the top cover: a. Tilt the top cover and slide it onto the UPS from the rear. Tabs in the rear of the top cover must connect to the slots in the…