Loading manual…
Loading manual…
For Internal Batteries Installation 60-80 kVA 400 V 09/2019 www.schneider-electric.com
For Internal Batteries Important Safety Instructions — SAVE THESE INSTRUCTIONS Read these instructions carefully and look at the equipment to become familiar…
of Single UPS UIB Unit input breaker SSIB Static switch input breaker UOB Unit output breaker MBB Maintenance bypass breaker BB Battery breaker 16 990-6204-001
For Internal Batteries Connect the Power Cables 1. Ensure that all breakers are in the OFF (open) position. 2. Remove the two bottom rear panels. Rear View of…
For Internal Batteries Communication Interfaces A. Parallel ports B. CAN_R: CAN termination resistor C. Dry contacts D. USB port E. EPO F. Slot for optional…
For Internal Batteries Backfeed Protection DANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH In systems where backfeed protection is not part of the…
DANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Ensure that the battery breakers (BB) are in the off position before installing batteries. Failure to…