Loading manual…
Loading manual…
Read these instructions carefully and look at the equipment to become familiar with it before trying to install, operate, service or maintain it. The following…
NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are…
DANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH All safety instructions in this document must be read, understood and followed. Failure to follow…
kVA 15 kVA 20 kVA 30 kVA 40 kVA Charging power Programmable from 1% to 15% of UPS capacity. Default is 10%. Maximum charging power (W) 1500 2250 3000 4500 6000…
NOTICE RISK OF EQUIPMENT DAMAGE Use only UL approved compression cable lugs. Failure to follow these instructions can result in equipment damage. UPS rating 10…
NOTE: Clearance dimensions are published for airflow and service access only. Consult with the local safety codes and standards for additional requirements in…
UIB Unit input breaker SSIB Static switch input breaker UOB Unit output breaker MBB Maintenance bypass breaker BB Battery relay Load Input Bypass MBB SSIB UIB…
NOTE: In parallel systems with an external maintenance bypass breaker Ext. MBB, the maintenance bypass breakers MBB must be padlocked in the open position. MIB…
External Inspection When the shipment arrives, inspect the shipping material for any signs of damage or mishandling. Do not attempt to install the system if a…
1. Move the UPS to the final installation area using a forklift or the pallet jack. 2. Remove the shipping materials and the ramp from the UPS. 24…
in a 10 kVA UPS 1. Ensure that all breakers are in the OFF (open) position. 2. Remove the conduit box cover. 3. Remove the two terminal covers. 990-6401C-001…
1. Ensure that all breakers are in the OFF (open) position. 2. Remove the conduit box cover. 3. Remove the two terminal covers. 990-6401C-001 27 Connect the…
Rear View of UPS A B C D E F A. Dry contacts B. Parallel ports C. Network management card (NMC) D. External MBB status indicator E. RS485 F. Cold start…
1. Connect the optional parallel cables (E3SOPT0023) between all the UPSs of the parallel system. NOTE: See Communication Interfaces, page 39 for location of…
1. Remove the plate in front of the battery shelves. 2. Cut the three cable ties that hold the battery cables to the frame. 3. Remove the screws before loading…